Development and infrastructure

Franklin, Saginaw and Green Vista.

George is asking for one dated public City and Region schedule, crossing measures for St. Benedict students until the underpass opens, and a Ward 8 meeting.

Find the Ward 8 councillor race and mark George Fiddick.

Illustration of crossing concerns

AI-generated illustrations. Not a photo of the site and not the Region’s design.

AI-generated illustration of two students at an imagined road crossing. The desktop comparison also shows an underpass concept, not the Region's design.
AI-generated illustrations. Not a photo of the site and not the Region's design.

What the published plans say

Two connected road projects

Franklin Boulevard

The Region’s preferred design for Franklin Boulevard between Avenue Road and Bishop Street includes roundabouts at Saginaw Parkway and Can-Amera Parkway.

At Saginaw, it includes a pedestrian underpass on the north side of the intersection, addressing the crossing concerns for St. Benedict Catholic Secondary School students. The other three legs would have crossings at road level.

The Region’s 2026 budget forecasts $26.3 million for this stretch, with most spending in 2027 and 2028. This is a budget forecast, not a confirmed construction schedule.

Region’s preferred design · Region budget, page 52, project 06416

Saginaw Parkway and Green Vista Drive

The City’s 2026 approved budget includes $884,000 for a roundabout at Saginaw Parkway and Green Vista Drive. The budget says the Region will lead construction.

The Region’s Franklin project page also includes this planned City roundabout. Residents need to know how the two projects fit together.

City budget, PDF page 142, project A/01489-40 · Franklin project page

George’s request

One dated public schedule

I’ll ask for one public schedule from the City and the Region for the Franklin Boulevard, Saginaw Parkway and Green Vista Drive work.

George’s request

Safe crossings while students wait

I’ll ask for crossing measures for St. Benedict students until the Saginaw underpass opens.

George’s request

A Ward 8 meeting

I’ll host a Ward 8 meeting so residents can ask about the schedule and student crossings.

Questions for George?

George reads and answers every message himself, within two business days.

Sources

Primary City and Region sources, checked 6 October 2026.

  1. Region of Waterloo, EngageWR: Franklin Boulevard improvements. Preferred design and planned Saginaw Parkway and Green Vista Drive roundabout.
  2. Region of Waterloo: 2026 budget book, PDF page 52. Project 06416 forecasts $26.274 million in total, rounded here to $26.3 million. The table forecasts $10.140 million in 2027 and $9.490 million in 2028.
  3. City of Cambridge: 2026 approved budget, PDF page 142 (printed page 140). Project A/01489-40 budgets $884,000 in 2026 for the Saginaw Parkway and Green Vista Drive roundabout, with construction led by the Region.