Franklin Boulevard
The Region’s preferred design for Franklin Boulevard between Avenue Road and Bishop Street includes roundabouts at Saginaw Parkway and Can-Amera Parkway.
At Saginaw, it includes a pedestrian underpass on the north side of the intersection, addressing the crossing concerns for St. Benedict Catholic Secondary School students. The other three legs would have crossings at road level.
The Region’s 2026 budget forecasts $26.3 million for this stretch, with most spending in 2027 and 2028. This is a budget forecast, not a confirmed construction schedule.
Region’s preferred design · Region budget, page 52, project 06416
